Drilling Machine
XY-2BL Crawler Mounted Core Integrate Drilling Rig
2017-11-30 18:37  Visit:52
Price:Unfilled
Send inquiry
1 Drilling depth (NQ drill rod) Approximately 500m 2 Spindle speed Forward 57; 99; 157; 217; 270; 470; 742; 1024  Reverse 45; 212  r/min 3 Spindle Maximum torque 3200 N·m 4 Spindle max pulling force 60 KN 5 Spindle stroke 600 mm 6 Max. lifting force of the hoist with single rope 30 KN 7 Inner diameter of the spindle 96 mm 8 Retraction distance 305 mm   Retraction distance for the host drill rig 330 mm   Retraction distance for both drill rig and tower 160 mm 10 Oil pump SCB32/12 double gear pump 11 Power unit engine power 30 KW     1500 r/min electric motor 22KW   1470 r/min 12 Crawler maximum walking speed 1.2  km/h 13 Crawler Climbing capacity 25°, no more than 25 ° 14 Tracked Ground pressure 0.042  MPa 15 Rig height 8 m 16  Hook load of the tower 29.4 kN 17 Max.static load of crown block beam 58.8 kN 18 Quantity of pulley 2 19 Angle range of tower ups and downs 0°~ 90° 20 Rig Dimensions ( tower horizontal position ) (L*W*H) 4450×2166×3080  mm 21 Total weight about 5500 kg
Message

TO: cgmeec3344

E-mail:

Content:

Contact information
Company:Chongqing Gold Mechanical & Electrical Equipment  CO.,LTD
Status:Offline Send a letter
Name:cgmeec3344(Mr.)
Tel:0086-023-62974421
Fax:0086-023-62940053
Area:Beijing
Address:9F/10,Jintai,Nanping,Chongqing,China
Zip code:400060
Linkurl:http://cgmeec3344.btxshb.com/
Comment
0